How to calculate/determine the amount and types of materials required for building constructions?

Checked on December 9, 2025
Disclaimer: Factually can make mistakes. Please verify important information or breaking news. Learn more.

Executive summary

Calculating the amount and types of materials for a building project starts with precise takeoffs (quantities by component) and then pricing those quantities using unit-cost benchmarks such as cost-per-square-meter or industry indices; many estimators multiply a per‑m² unit cost by the building area and adjust for material/labor/scope [1] [2]. Accurate budgeting must also track volatile material prices and indices — PPIs, Mortenson’s cost index and government material indices show material and labor costs moved materially through 2022–2025 and remain a key driver of total cost [3] [4] [5].

1. Start with a measured takeoff — count every component

The technical first step is a quantity takeoff: measure areas, lengths and counts from plans to list required items (concrete by cubic metre, rebar by ton, bricks by unit, windows by count). Estimator guides walk through standard formulas and common allowances for waste and cutoffs; hiring a quantity surveyor or using takeoff software reduces human error and the small mistakes that drive large overruns [2].

2. Convert quantities into material types and grades

Once you have counts, assign material types and specifications (e.g., 20 MPa concrete, A615 rebar grade, treated vs. untreated lumber). Materials and their quality directly change cost and installation method; blogs and cost guides stress that “type and quality of materials used directly affect total cost” and are central to the per‑square‑metre costing approach used by many builders [1].

3. Price using unit rates, indices and local quotes

There are three practical pricing layers: contractor unit rates (cost per m² that bundle labor/materials/overhead), published indices like PPI or Mortenson’s Construction Cost Index, and live supplier quotes. PPI Final Demand indices represent whole‑building bid prices (including labor and margins), while PPI inputs and government material price tables show raw material inflation — use both to cross‑check your numbers [3] [5] [4].

4. Use per‑square‑metre as a sanity check — but don’t rely on it alone

Many builders estimate total cost by multiplying a unit cost per m² by the project area; this is a quick sanity check and commonly recommended for early budgeting [1]. However, that method masks scope differences (complex façades, high ceilings, mechanical systems) and regional price spreads; combine it with detailed takeoffs and supplier pricing to get reliable results [1] [4].

5. Account for volatility: steel, lumber, cement and logistics

Material markets have been volatile since the pandemic; steel rebar, lumber and equipment parts saw large swings and remain uncertain in 2025. Industry trackers show rebar and steel prices spiked in prior years and stayed elevated into late 2024; construction cost indices and forecasts recommend building contingency for material inflation and supply‑chain shocks [6] [7] [4].

6. Manage inventory, lead times and supplier relationships

Practical mitigation includes locking prices with purchase orders, staggering buys, and using inventory/job‑costing software to track usage and price movements. Contractor guidance in 2025 emphasizes supplier relationships and inventory controls to reduce exposure to sudden tariff or freight shifts [7] [8].

7. Include waste, installation rates and escalation in your totals

Quantity takeoffs must add allowances for cutting, breakage and onsite waste; installation labor and equipment can exceed material cost in many scopes. Also include escalation/contingency line items tied to indices (e.g., PPI or regional construction cost indices) to handle price movement between estimating and procurement [3] [4].

8. Use multiple data sources and document assumptions

Best practice: triangulate — combine a detailed takeoff [2], per‑m² benchmarks for early budgets [1], and up‑to‑date indices and market reports for inflation risk [3] [4] [5]. Explicitly record assumptions (waste factors, grade of steel, lead times) so future re‑estimates are traceable.

Limitations and disagreements in sources

Industry blogs and contractor guides favor the per‑m² approach for quick estimates [1] while economists and index providers stress disaggregation — input PPIs versus selling‑price PPIs — to capture contractor margins and scope differences [3]. Government statistics give granular material inflation but are regionally focused (UK tables) and may lag live market quotes [5]. Available sources do not mention specific step‑by‑step formulas for every material in every jurisdiction; local codes and supplier practices will change exact calculations [2].

Bottom line — combine accurate plan‑based takeoffs, material specifications, live supplier quotes and index‑based escalation; treat per‑m² as a budgeting shortcut, not a final estimate, and build contingencies for volatile commodities like steel and lumber [2] [1] [3].

Want to dive deeper?
What are the standard formulas for calculating quantities of concrete, mortar, and cement for different structural elements?
How do I create a material takeoff from architectural and structural drawings step by step?
What software tools and Excel templates are best for generating accurate bill of quantities for building projects in 2025?
How do waste allowances, material losses, and contingency percentages get applied to construction material estimates?
How do material specifications and local building codes affect types and quantities of materials required?