When was the grass at UVU replaced with concrete pavers

Checked on February 1, 2026
Disclaimer: Factually can make mistakes. Please verify important information or breaking news. Learn more.

Executive summary

The grass in the Utah Valley University courtyard where Charlie Kirk was shot was removed and workers were reported installing concrete or permeable pavers in mid-September 2025, with media images and local reporting noting activity on or immediately after September 15–16, 2025 [1] [2] [3]. Available reporting documents the start of soil removal and paver installation but does not provide an exact completion date or an official university timeline in the materials provided [2] [1].

1. What the contemporaneous reporting shows about timing

Photographs and wire-service captions published on September 15, 2025 show workers laying concrete pavers where grass had been removed at the Utah Valley University site tied to the fatal shooting of Charlie Kirk, and local outlets described soil being removed for paver installation as the campus prepared to reopen the following Monday, indicating work began immediately after the September 15 incident [1] [2].

2. Differing framings in mainstream outlets and partisan pages

Mainstream visual reporting (Reuters) frames the change as workers installing pavers at the scene on September 15, 2025 and presents it as on-the-ground photojournalism [1], while partisan sites echoed and amplified the same fact with editorialized language — for example asserting “they’re replacing the grass” as a pointed claim — which signals political framing even when the underlying action (installation of pavers) is consistent across sources [3].

3. Context: UVU’s existing use of permeable pavers and plausible motives

Utah Valley University’s own materials describe use of interlocking permeable pavers on campus to allow precipitation to percolate into soil and reduce erosion, so installing pavers at a courtyard is consistent with existing campus landscaping practices and stormwater management approaches rather than uniquely punitive or symbolic landscaping [4]. News reporting that soil was being removed for paver installation suggests the work was practical — replacing disturbed turf and stabilizing the area for safety and access as the university reopened — though reporting does not quote a formal UVU announcement in the supplied sources [2].

4. What is supported by the sources and what remains unanswered

The supplied sources support that removal of grass and installation of concrete or grid/permeable pavers was underway on or immediately after September 15–16, 2025 [1] [2] [3]. The sources do not provide a formal UVU press release with a start/finish date, budget, or an explicit rationale directly quoted from university officials in the materials provided, so the precise date of final completion and any long-term plan for that courtyard cannot be confirmed from these items alone [2] [1].

5. Alternative explanations and implicit agendas in coverage

Two reasonable readings coexist in the coverage: one practical — rapid site repair, erosion control, and campus reopening using a paving solution the university already employs [4] [2] — and one political, where partisan outlets use the visible change to signal motive or symbolism surrounding a high-profile killing [3]. The Reuters and NewsNation reporting are photographic and descriptive, while the partisan source packages the same actions as pointed commentary; that contrast advises caution when inferring intent beyond the observable installation work [1] [2] [3].

6. Bottom line for the question “When was the grass replaced with concrete pavers?”

Based on photographic and reporting evidence, workers began removing soil and installing pavers in the courtyard linked to the Charlie Kirk event on or immediately after September 15, 2025, and media documented active installation on September 15–16, 2025; the exact date the grass was fully removed and the pavers completed is not specified in the supplied sources [1] [2] [3].

Want to dive deeper?
When did UVU officially announce landscaping changes after the September 2025 shooting and what reasons did it give?
What are permeable pavers and why do universities choose them for campus landscaping?
How did different media outlets and partisan websites cover the post-shooting site changes at Utah Valley University?