How many miles of border fencing existed at the U.S.-Mexico border by Jan 2017 and Dec 2025?

Checked on December 12, 2025
Disclaimer: Factually can make mistakes. Please verify important information or breaking news. Learn more.

This fact-check may be outdated. Consider refreshing it to get the most current information.

Executive summary

Public sources converge that roughly 650–700 miles of physical barriers already existed along the U.S.–Mexico border by January 2017 (commonly reported as ~650–654 miles or "about 650–700") [1] [2] [3]. Federal reporting and agency maps for late 2025 show a substantially higher figure: Customs and Border Protection (CBP) listed about 702 miles of primary wall plus ~75 miles of secondary wall as “existing” prior to January 20, 2025, and plans and contracts announced in 2025 aim to add hundreds more miles — various outlets cite totals in the 700–1,422 mile range depending on definitions and planned versus completed work [4] [5] [6].

1. What “miles of fencing” meant in January 2017 — a snapshot

Official and analyst counts in early 2017 clustered around roughly 650 miles of barrier: government and non‑profit tallies described about 650–654 miles of primary pedestrian and vehicle fencing already in place before President Trump took office [2] [1] [3]. Reporting by PBS and policy groups used “650” or “650–700” miles as a shorthand for discontinuous segments of fencing that existed along the roughly 1,954‑mile border [3] [1].

2. Why sources give slightly different January‑2017 numbers

Discrepancies stem from definitions: some tallies count only primary pedestrian fencing, others add vehicle barriers, secondary or tertiary layers, and some map discontinuous segments versus continuous miles. Independent mapping projects found 653 discontinuous miles while policy groups rounded to 650 or cited 654 miles based on CBP inventories — all describe the same reality but apply different inclusion rules [7] [1] [2].

3. The baseline going into 2025 and CBP’s “existing barrier” figure

CBP’s Smart Wall materials list “Existing Barrier (prior to 1/20/2025): ~702 miles of Primary Wall & ~75 miles of Secondary Wall,” marking an agency baseline that is higher than many earlier counts and treats primary/secondary barriers separately [4]. That CBP figure is the principal federal accounting referenced by subsequent 2025 planning documents and media coverage [4].

4. Construction, replacements and semantics driving 2017–2025 changes

Between 2017 and 2025, administrations both built new segments and replaced or upgraded older barriers. The Trump administration previously reported hundreds of miles “completed” (CBP said ~452 miles completed by early 2021, a figure that included many replacements), and 2025 federal contract announcements and program names like “Smart Wall” treat replacements, upgrades, and new miles differently — complicating direct year‑to‑year comparisons [8] [5] [4].

5. How 2025 totals diverge across outlets — planned vs. completed

By late 2025 some news outlets and advocacy groups cited roughly 700 miles now in place, with plans to add 230 miles of new barriers under recent contracts and even larger ambitions (DHS/CBP plans for 1,422 miles cited by some press) [9] [6] [5]. The Washington Times reported DHS’s Smart Wall plan of 1,422 miles as a proposed buildout; WOLA and CBP materials described the specific contracts and funded miles (230 planned in one report; CBP’s baseline plus planned work is the operative breakdown) [5] [6] [4].

6. What can be stated confidently, and what remains unresolved

Confident: widely cited January 2017 tallies put existing barriers at roughly 650–654 miles [1] [2] [3]. Confident: CBP’s own 2025 Smart Wall page lists ~702 miles primary + ~75 miles secondary as pre‑Jan‑20‑2025 existing barriers; separate 2025 reporting documents planned additions and contracts that would raise the barrier mileage further [4] [6]. Unresolved in these sources: a single, reconciled count for “miles of fencing as of December 2025” (completed vs. planned vs. replaced) — outlets differ, and CBP’s public map updates weekly, so totals depend on the snapshot and the inclusion rules used [4] [5].

7. How to interpret conflicting headline numbers

When reading a headline number (e.g., “654 miles,” “702 miles,” “1,422 miles”), check whether the reporter: (a) cites CBP or independent mapping, (b) counts primary versus secondary/vehicle barriers, and (c) includes planned/contracted miles as “built.” Many sources conflate replacements with new construction; CBP’s Smart Wall materials explicitly separate existing primary/secondary miles from planned construction [7] [4] [5].

8. Bottom line for your two dates

  • Jan 2017: Approximately 650–654 miles of barrier were in place according to government inventories and policy analyses [1] [2] [3].
  • Dec 2025: Available sources do not provide a single reconciled “December 31, 2025” completed‑mile total; federal CBP materials show ~702 miles primary + ~75 miles secondary as the pre‑1/20/2025 baseline and 2025 reporting documents describe additional contracts and plans (e.g., 230 miles contracted, and larger Smart Wall ambitions up to 1,422 miles reported by some outlets) — actual completed mileage at year‑end depends on which of those projects were finished and which are classified as replacement vs. new [4] [6] [5].

Limitations: this synthesis uses only the supplied reporting and CBP materials; the precise December 2025 completed‑miles figure is not uniform across those sources and would require CBP’s weekly Smart Wall map snapshot or a CBP year‑end report to reconcile fully [4].

Want to dive deeper?
How many miles of border barriers were constructed between 2017 and 2025 and where are they located?
What federal agencies maintain and report statistics on U.S.-Mexico border fencing mileage?
How do different types of border barriers (primary, secondary, tertiary) count toward total mileage figures?
What funding bills and executive actions affected border wall construction from 2017 to 2025?
How have legal challenges, land acquisition issues, and environmental reviews impacted completed miles of fencing?