Executive summary

The legal basis for the Entry/Exit System (EES) is Regulation (EU) 2017/2226, adopted in November 2017 and in force since December 2017; eu‑LISA is responsible for development and operation [1]. After repeated delays, the Commission proposed a progressive (phased) start in December 2024 giving Member States six months to deploy; the Commission and co‑legislators later set a progressive launch window beginning 12 October 2025 with full implementation by April 2026 under transitional rules adopted in 2025 [2] [3] [4].

1. Legal foundation: a 2017 regulation that created EES and assigned responsibilities

EES rests on Regulation (EU) 2017/2226, which established a centralised IT system to register entries, exits and refusals for non‑EU nationals staying up to 90 days, and tasked eu‑LISA with development and operational management; later amendments in 2024 adjusted related screening and interoperability rules [1] [5].

2. What the law requires EES to do and what data it holds

The regulation mandates biometric registration (fingerprints and facial images) and storage of identity and travel data to calculate authorised stay and detect overstayers; the system is explicitly designed to replace passport stamping and to interoperate with VIS and other EU systems [1] [6].

3. Timeline: repeated slips from 2022 → 2024 → 2025 and a progressive start

EES was originally scheduled for 2022 but encountered technical and readiness problems and was repeatedly postponed through 2023–24. The Commission proposed a progressive start on 4–5 December 2024 that would give Member States six months to deploy after formal adoption [7] [2]. Official EU pages and reporting show the Commission subsequently set 12 October 2025 as the start of the progressive introduction, with related transitional derogations adopted in mid‑2025 to permit the phased rollout and a path to full implementation by April 2026 [3] [4].

4. 2024 implementation milestones and the shift to phased launch

Throughout 2024 the narrative shifted from an autumn 2024 go‑live to a recognition that many Member States were unprepared. Officials and industry groups reported planned dates such as 6–10 October and 10 November 2024 at various points, but those dates were subsequently abandoned as the Commission moved to a legal proposal for gradual introduction in December 2024 [8] [9] [10] [11] [2]. The Commission’s proposal explicitly built a six‑month deployment window into the legal framework [2].

5. The 2025/2026 progressive roll‑out and legal amendments

To permit a phased start, the European Parliament and Council adopted Regulation (EU) 2025/1534 on temporary derogations (the progressive start) in mid‑2025; the Commission then set 12 October 2025 for the start of operations under that regime and the progressive introduction to run toward full coverage by April 2026 [3] [4]. Some legal texts referenced in official EU pages and analyses explain how Member States may opt for staged coverage [12] [3].

6. Conflicting public accounts in 2024: multiple announced dates and cancellations

Media and industry outlets in 2024 quoted a range of dates — “autumn 2024,” 6–10 October, 10 November — and on several occasions the Commissioner and eu‑LISA signalled such targets; other reporting flagged that the November 2024 launch was canceled with “no new date set” while the Commission explored phased rollout and legal tweaks [7] [10] [11] [9]. Those competing accounts reflect the gap between political target dates and technical/member‑state readiness.

7. Rights, oversight and data‑protection steps tied to the rollout

EU data‑protection and fundamental‑rights bodies treated EES roll‑out as a major item: the EU Fundamental Rights Agency and the EDPB flagged implications and prepared guidance, and coordinated supervisory arrangements were expanded ahead of the system’s operational start [13] [14]. eu‑LISA published progress on system baselines and joint rehearsals in 2024, underscoring technical work behind the legal timetable [15].

8. Bottom line and practical implications for travellers and states

Legally, EES is firmly anchored in EU secondary law from 2017 and has been amended to allow phased introduction; politically and operationally, the Commission moved in late 2024 to a six‑month progressive‑start model because many Member States and border points were not ready, and the formal progressive launch was scheduled for October 2025 with completion into April 2026 [1] [2] [3]. Available sources do not mention a single uninterrupted full EU‑wide go‑live in 2024; instead they document the shift to phased implementation and the exact legal measures enabling it [11] [2] [3].

Limitations: this briefing cites only the supplied reporting and EU sources; national transpositions, precise border‑by‑border technical readiness and any subsequent changes after the cited documents are not covered here because those details are not found in the current reporting provided (not found in current reporting).

Want to dive deeper?
What is the exact legal framework establishing the EU Entry/Exit System (EES)?
Which EU member states had implementation milestones for EES in 2024 and what were they?
How do EES rules interact with data protection laws like the GDPR and EDPS guidance?
What are the technical and operational steps required for carriers and border authorities to comply with EES?
What legal challenges or court cases have affected the EES rollout and their outcomes?